WEKO3
-
RootNode
アイテム
New treatment facility project at HIMAC/
https://repo.qst.go.jp/records/64029
https://repo.qst.go.jp/records/6402990f70a73-0e4b-4fc9-9a9e-721f5b23b7c5
Item type | 会議発表用資料 / Presentation(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2010-09-29 | |||||
タイトル | ||||||
タイトル | New treatment facility project at HIMAC/ | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_c94f | |||||
資源タイプ | conference object | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
Noda, Kouji
× Noda, Kouji× 野田 耕司 |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | The first clinical trial with carbon beams generated from HIMAC was conducted in June 1994. The total number of patients treated was 5,196 as of February 2010. The impressive advance of carbon-ion therapy using HIMAC has been supported by high-reliability operation and by the development of accelerator technology. Based on more than ten years of experience with HIMAC, we have proposed a new treatment facility for the further development of therapy with HIMAC. The new facility, as an extension of the existing one, has been designed, and the related R&D work has been carried out. The building of the new treatment facility was already completed in March 2010, and the 1st treatment is scheduled in March 2011. The following description gives a summary account of the design study and the related R&D work for this new treatment facility at HIMAC. | |||||
会議概要(会議名, 開催地, 会期, 主催者等) | ||||||
内容記述タイプ | Other | |||||
内容記述 | 1)nirs-Kalorinsuka Joint Sympo | |||||
発表年月日 | ||||||
日付 | 2010-09-11 | |||||
日付タイプ | Issued |