WEKO3
アイテム
CONSTRUCTION OF AN INFRARED FEL AT THE COMPACT ERL
https://repo.qst.go.jp/records/85885
https://repo.qst.go.jp/records/85885ed6605c6-6518-44b8-981d-83f0de773b58
Item type | 会議発表論文 / Conference Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2022-04-07 | |||||
タイトル | ||||||
タイトル | CONSTRUCTION OF AN INFRARED FEL AT THE COMPACT ERL | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_5794 | |||||
資源タイプ | conference paper | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
Ryoichi, Hajima
× Ryoichi, Hajima× Kato, R.× Adachi, M.× Eguchi, E.× Harada, K.× Ryoichi, Hajima |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | The compact Energy Recovery Linac (cERL) has been in operation at KEK since 2013 to demonstrate ERL performance and develop ERL technology. Recently KEK has launched an infrared Free-Electron Laser (FEL) project with a competitive funding. The purpose of this project is to build a mid-infrared FEL based on the cERL, and to use that FEL as a light source for creating the processing database required for industrial lasers. The FEL system is a single-pass FEL composed of two 3-m undulators and a matching section between them. The FEL was constructed from October 2019 to May 2020. The commissioning was completed successfully, and the target power of the project was almost achieved. |
|||||
書誌情報 |
Proceedings of the IPAC 2021 発行日 2022-04 |
|||||
DOI | ||||||
識別子タイプ | DOI | |||||
関連識別子 | 10.18429/JACoW-IPAC2021-TUPAB099 | |||||
関連サイト | ||||||
識別子タイプ | URI | |||||
関連識別子 | https://accelconf.web.cern.ch/ipac2021/papers/tupab099.pdf |