ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. 原著論文

On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

https://repo.qst.go.jp/records/84639
https://repo.qst.go.jp/records/84639
999b0b64-17bb-4993-946d-6b75dee25862
Item type 学術雑誌論文 / Journal Article(1)
公開日 2021-09-30
タイトル
タイトル On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress
言語
言語 eng
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_6501
資源タイプ journal article
アクセス権
アクセス権 metadata only access
アクセス権URI http://purl.org/coar/access_right/c_14cb
著者 Toigo, V.

× Toigo, V.

WEKO 1021498

Toigo, V.

Search repository
Marcuzzi, D.

× Marcuzzi, D.

WEKO 1021499

Marcuzzi, D.

Search repository
Serianni, G.

× Serianni, G.

WEKO 1021500

Serianni, G.

Search repository
Boldrin, M.

× Boldrin, M.

WEKO 1021501

Boldrin, M.

Search repository
Chitarin, G.

× Chitarin, G.

WEKO 1021502

Chitarin, G.

Search repository
Dal Bello, S.

× Dal Bello, S.

WEKO 1021503

Dal Bello, S.

Search repository
Grando, L.

× Grando, L.

WEKO 1021504

Grando, L.

Search repository
Luchetta, A.

× Luchetta, A.

WEKO 1021505

Luchetta, A.

Search repository
Pasqualotto, R.

× Pasqualotto, R.

WEKO 1021506

Pasqualotto, R.

Search repository
Zaccaria, P.

× Zaccaria, P.

WEKO 1021507

Zaccaria, P.

Search repository
Mieko, Kashiwagi

× Mieko, Kashiwagi

WEKO 1021508

Mieko, Kashiwagi

Search repository
Hiroyuki, Tobari

× Hiroyuki, Tobari

WEKO 1021509

Hiroyuki, Tobari

Search repository
Kazuhiro, Watanabe

× Kazuhiro, Watanabe

WEKO 1021510

Kazuhiro, Watanabe

Search repository
Tetsuya, Maejima

× Tetsuya, Maejima

WEKO 1021511

Tetsuya, Maejima

Search repository
Atsushi, Kojima

× Atsushi, Kojima

WEKO 1021512

Atsushi, Kojima

Search repository
Eiji, Ooshita

× Eiji, Ooshita

WEKO 1021513

Eiji, Ooshita

Search repository
Yasuo, Yamashita

× Yasuo, Yamashita

WEKO 1021514

Yasuo, Yamashita

Search repository
Shunsuke, Konno

× Shunsuke, Konno

WEKO 1021515

Shunsuke, Konno

Search repository
Others

× Others

WEKO 1021516

Others

Search repository
Mieko, Kashiwagi

× Mieko, Kashiwagi

WEKO 1021517

en Mieko, Kashiwagi

Search repository
Hiroyuki, Tobari

× Hiroyuki, Tobari

WEKO 1021518

en Hiroyuki, Tobari

Search repository
Kazuhiro, Watanabe

× Kazuhiro, Watanabe

WEKO 1021519

en Kazuhiro, Watanabe

Search repository
Tetsuya, Maejima

× Tetsuya, Maejima

WEKO 1021520

en Tetsuya, Maejima

Search repository
Atsushi, Kojima

× Atsushi, Kojima

WEKO 1021521

en Atsushi, Kojima

Search repository
Eiji, Ooshita

× Eiji, Ooshita

WEKO 1021522

en Eiji, Ooshita

Search repository
Yasuo, Yamashita

× Yasuo, Yamashita

WEKO 1021523

en Yasuo, Yamashita

Search repository
Shunsuke, Konno

× Shunsuke, Konno

WEKO 1021524

en Shunsuke, Konno

Search repository
抄録
内容記述タイプ Abstract
内容記述 To reach fusion conditions and control the plasma configuration in ITER, the next step in tokamak fusion research, two neutral beam injectors (NBIs) will supply 16.5 MW each, by neutralizing accelerated negative hydrogen or deuterium ions. The requirements of ITER NBIs (40A/1 MeV D- ions for ≤1 h, 46A/870 keV H- ions for ≤1000 s) have never been simultaneously attained. So in the Neutral Beam Test Facility (NBTF, Consorzio RFX, Italy) the operation of the full-scale ITER NBI prototype (MITICA) will be tested and optimised up to full performances, focussing on accelerator (including voltage holding), beam optics, neutralisation, residual ion removal. The NBTF includes also the full-scale prototype of the ITER NBI source with 100 keV particle energy (SPIDER), for early investigation of: negative ion production and extraction, source uniformity, negative ion current density and beam optics.

This paper will describe the main results of the first two years of SPIDER operation, devoted to characterizing plasma and beam parameters, including investigation of RF-plasma coupling efficiency and magnetic filter field effectiveness in reducing co-extracted electrons. SPIDER is progressing towards the first caesium injection, which aims at increasing the negative ion density. A major shutdown, planned for 2021, to solve the issues identified during the operation and to carry out programmed modifications, will be outlined.

The installation of each MITICA power supply and auxiliary system is completed; in-vessel mechanical components are under procurement by Fusion for Energy (F4E). Integration, commissioning and test of the power supplies, procured by F4E and QST, as the Japanese Domestic Agency (JADA), will be presented. In particular, 1.0MV insulating tests were carried out step-by-step and successfully completed. In 2020 integrated tests of the power supplies on the accelerator dummy load started, including the assessment of their resilience to accelerator grid breakdowns using a short-circuit device located in vacuum.

The aggressive programme, to validate the NBI design at NBTF and to meet ITER schedule (requiring NBIs in operation in 2032), will be outlined. Unfortunately, in 2020 the coronavirus disease infection affected the NBTF activities. A solution to proceed with integrated power tests despite the coronavirus is presented.
書誌情報 Fusion Engineering and Design

巻 168, p. 112622, 発行日 2021-07
ISSN
収録物識別子タイプ ISSN
収録物識別子 0920-3796
DOI
識別子タイプ DOI
関連識別子 10.1016/j.fusengdes.2021.112622
関連サイト
識別子タイプ DOI
関連識別子 https://doi.org/10.1016/j.fusengdes.2021.112622
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 17:08:58.902691
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3