WEKO3
アイテム
Overview of Construction and First Commissioning Results of JT-60SA Superconducting Magnets
https://repo.qst.go.jp/records/84635
https://repo.qst.go.jp/records/84635dc0b6596-710d-4087-8921-61945bd8838e
Item type | 会議発表用資料 / Presentation(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2022-01-20 | |||||
タイトル | ||||||
タイトル | Overview of Construction and First Commissioning Results of JT-60SA Superconducting Magnets | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_c94f | |||||
資源タイプ | conference object | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
Haruyuki, Murakami
× Haruyuki, Murakami× Haruyuki, Murakami |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | JT-60SA (JT-60 Super Advanced) is a full-superconducting tokamak built in Ibaraki Japan. In 2012, the construction of JT-60SA started and the last superconducting magnet was assembled in 2019. Cooldown of magnet system stared in 2020 and the energization test was performed from January to March 2021. In this presentation, the overview of construction, the result of first commissioning and future commissioning plan will be reported. | |||||
会議概要(会議名, 開催地, 会期, 主催者等) | ||||||
内容記述タイプ | Other | |||||
内容記述 | 27th International Conference on Magnet Technology (MT-27) | |||||
発表年月日 | ||||||
日付 | 2021-11-18 | |||||
日付タイプ | Issued |