ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. 学会発表・講演等
  2. 口頭発表

Improvement in reliability of RF system of Linear IFMIF Prototype Accelerator (LIPAc)

https://repo.qst.go.jp/records/77884
https://repo.qst.go.jp/records/77884
deb52077-81d6-48f2-905c-f8a01c8514ad
Item type 会議発表用資料 / Presentation(1)
公開日 2019-12-10
タイトル
タイトル Improvement in reliability of RF system of Linear IFMIF Prototype Accelerator (LIPAc)
言語
言語 eng
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_c94f
資源タイプ conference object
アクセス権
アクセス権 metadata only access
アクセス権URI http://purl.org/coar/access_right/c_14cb
著者 Shinya, Takahiro

× Shinya, Takahiro

WEKO 823597

Shinya, Takahiro

Search repository
Kondo, Keitaro

× Kondo, Keitaro

WEKO 823598

Kondo, Keitaro

Search repository
Sakamoto, Keishi

× Sakamoto, Keishi

WEKO 823599

Sakamoto, Keishi

Search repository
Sugimoto, Masayoshi

× Sugimoto, Masayoshi

WEKO 823600

Sugimoto, Masayoshi

Search repository
Shinya, Takahiro

× Shinya, Takahiro

WEKO 823601

en Shinya, Takahiro

Search repository
Kondo, Keitaro

× Kondo, Keitaro

WEKO 823602

en Kondo, Keitaro

Search repository
Sakamoto, Keishi

× Sakamoto, Keishi

WEKO 823603

en Sakamoto, Keishi

Search repository
Sugimoto, Masayoshi

× Sugimoto, Masayoshi

WEKO 823604

en Sugimoto, Masayoshi

Search repository
抄録
内容記述タイプ Abstract
内容記述 The Linear IFMIF Prototype Accelerator (LIPAc) to accelerate a 9 MeV deuteron beam at 125 mA in CW is under commissioning in Rokkasho, Japan, in order to validate the low energy section of the 40 MeV IFMIF accelerator under the Broader Approach Agreement in the field of fusion energy research between Japan and EURATOM. The LIPAc RF system for RFQ consists of eight RF chains, whose maximum output power are 200 kW each in CW at 175 MHz. The RFQ is designed to accelerate a deuteron beam of 125-130 mA from 0.1 MeV to 5 MeV in CW, which demands a total RF injected power of about 1.2 MW in CW. During the RF conditioning of the RFQ up to the deuteron acceleration level starting from July 2017, we faced difficulties for increasing RF power due to the unexpected high reflected power from the RFQ to the eight RF chains and the requirement of the short pulse and high repetition rate operation for the RF conditioning. During the two experimental campaigns a drastic maintenance was carried out, and resulted in overcoming the difficulties and succeeding to perform the deuteron beam commissioning in the low duty cycle. The experience and the lesson learnt will be presented so as to provide some hints to build a similar high power accelerator facility.
会議概要(会議名, 開催地, 会期, 主催者等)
内容記述タイプ Other
内容記述 The 7th Accelerator Reliability Workshop (ARW 2019)
発表年月日
日付 2019-11-14
日付タイプ Issued
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 18:29:01.593184
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3