WEKO3
アイテム
Validation of the Linear IFMIF Prototype Accelerator (LIPAc) in Rokkasho
https://repo.qst.go.jp/records/77882
https://repo.qst.go.jp/records/778824c6bf171-a7a1-4081-bd3a-95621ef41691
Item type | 会議発表用資料 / Presentation(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2019-12-10 | |||||
タイトル | ||||||
タイトル | Validation of the Linear IFMIF Prototype Accelerator (LIPAc) in Rokkasho | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_c94f | |||||
資源タイプ | conference object | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
Kondo, Keitaro
× Kondo, Keitaro× Akagi, Tomoya× Ebisawa, Takashi× Hirata, Yosuke× Kasugai, Atsushi× Kumagai , Kohki× Kwon, Saerom× Maebara, Sunao× Sakamoto, Keishi× Shimosaki, Yoshito× Shinya, Takahiro× Sugimoto, Masayoshi× Keitaro, Kondo× Tomoya, Akagi× Takashi, Ebisawa× Yosuke, Hirata× Atsushi, Kasugai× Kohki, Kumagai× Kwon, Saerom× Sunao, Maebara× Keishi, Sakamoto× Yoshito, Shimosaki× Takahiro, Shinya× Masayoshi, Sugimoto |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | For the development of the International Fusion Materials Irradiation Facility (IFMIF) aiming at material tests for fusion power plants, the construction of the Linear IFMIF Prototype Accelerator (LIPAc) has been conducted at Rokkasho, Japan under the Broader Approach Agreement. The commissioning of LIPAc has been progressing significantly. The world most powerful RFQ successfully accelerated proton beam of 58 mA, and an important project milestone of the acceleration of deuteron beam to 5 MeV with the beam current of 125 mA in pulse mode was successfully achieved. The result proves the validity of the present RFQ design. The adjustment and tuning of the RF power system and the injector for enabling an operation at maximum performances played an important role in achieving this result. For the next step, the preparation of the high duty cycle operation of RFQ is underway. The installation of the HEBT (High Energy Beam Transport line) and the beam dump accepting 1 MW, CW beam, has been completed and a new beam transport line is under manufacturing. Also the assembly of the Superconducting RF (SRF) linac to accelerate the beam up to 9 MeV started in a clean room in Rokkasho. | |||||
会議概要(会議名, 開催地, 会期, 主催者等) | ||||||
内容記述タイプ | Other | |||||
内容記述 | The 14th International Symposium on Fusion Nuclear Technology | |||||
発表年月日 | ||||||
日付 | 2019-09-24 | |||||
日付タイプ | Issued |