Practical consideration of facility startup - Commissioning & QA for scanning system

https://repo.qst.go.jp/records/75821
https://repo.qst.go.jp/records/75821
417f44aa-5fbf-4eb7-b92f-255ab8399079
Item type 会議発表用資料 / Presentation(1)
公開日 2019-05-14
タイトル
タイトル Practical consideration of facility startup - Commissioning & QA for scanning system
言語
言語 eng
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_c94f
資源タイプ conference object
アクセス権
アクセス権 metadata only access
アクセス権URI http://purl.org/coar/access_right/c_14cb
著者 Fufukawa, Takuji

× Fufukawa, Takuji

WEKO 752080

Fufukawa, Takuji

Search repository
Furukawa, Takuji

× Furukawa, Takuji

WEKO 752081

en Furukawa, Takuji

Search repository
抄録
内容記述タイプ Abstract
内容記述 Since 1984, when HIMAC project was initiated, NIRS has been leading the development of heavy ion therapy system. We have been developing cutting-edge technologies, such as fast scanning and superconducting gantry. In the development of the new treatment facility of NIRS-HIMAC, it was great challenge to realize treatment of a moving target by scanning irradiation. In order to realize this, the development of the fast scanning system is one of the most important issues in this project. The treatment with scanned ion beam was started in May 2011, and treatment of moving target was started in March 2015. In parallel with the scanning development, we developed sophisticated accelerator control, i.e. multiple energy operation, and superconducting gantry. The multiple energy operation makes it possible to deliver different beam energies in single synchrotron cycle. The time to change beam energy is suppressed within 0.3 seconds by means of this operation. In addition, this operation gives us smaller beam size, because range shifter plates are not necessary. From September 2015, we started the routine use of more than 200 energy steps. The construction of superconducting gantry was completed in 2015 and started clinical operation in 2017. Throughout these works, we have experienced a lot of acceptance tests and commissioning for therapeutic carbon ion beams. Furthermore, QA, as a verification of accepted performance constancy, should be routinely programmed. In this talk, above described progress and related practical works will be introduced.
会議概要(会議名, 開催地, 会期, 主催者等)
内容記述タイプ Other
内容記述 YCC - QST-NIRS Joint symposium
発表年月日
日付 2019-05-06
日付タイプ Issued
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 18:55:33.703997
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3