ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. 学会発表・講演等
  2. ポスター発表

Design of inboard first wall for the initial operation phase of JT- 60SA

https://repo.qst.go.jp/records/72832
https://repo.qst.go.jp/records/72832
794601a0-eb78-4789-b2ff-a4ee70c00134
Item type 会議発表用資料 / Presentation(1)
公開日 2018-06-22
タイトル
タイトル Design of inboard first wall for the initial operation phase of JT- 60SA
言語
言語 eng
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_c94f
資源タイプ conference object
アクセス権
アクセス権 metadata only access
アクセス権URI http://purl.org/coar/access_right/c_14cb
著者 鶴, 大悟

× 鶴, 大悟

WEKO 717499

鶴, 大悟

Search repository
鶴 大悟

× 鶴 大悟

WEKO 717500

en 鶴 大悟

Search repository
抄録
内容記述タイプ Abstract
内容記述 This article introduces overview of inboard first wall of the JT-60SA device, especially for the initial operation phase including the first plasma. The objective of the inboard first wall is to protect magnetic sensors from plasma. There is no cooling water for in-vessel components in the initial operation phase of JT-60SA, and it will be installed in the later phase. Graphite armour tiles are employed. The first wall should withstand forces such as magnetic forces due to eddy and halo currents, acceleration due to plasma disruption and earth quake (5G in the three directions at the maximum), and heat loads such as radiation from plasma, limiter configuration and ECRH direct irradiation.
\nTo address these requirements, the inboard first wall was designed, which consists of graphite tiles, stainless pedestals and support bases. The support bases are welded on the surface of the inboard vacuum vessel. The stainless pedestals are bolted on the support bases. Two graphite tiles are bolted on each support base. Shed roof shape of graphite tiles is employed to avoid heat concentration at side face of the tiles and to mitigate heat load during limiter configuration. Thermal structural numerical analyses are carried out, and it was confirmed that the stress is below the design stress against the predicted heat loads. It was also confirmed that the stress is below the limit against the predicted forces. Taking into account these analyses, it was confirmed the design of the inboard first wall for the initial operation phase was reasonable.
\nThe inboard first wall in the later phase was also designed. The non-cooled stainless pedestals will be replaced by active-cooled copper heat sinks. The graphite tiles and the support bases will be re-used.
会議概要(会議名, 開催地, 会期, 主催者等)
内容記述タイプ Other
内容記述 30th edition of the Symposium on Fusion Technology (SOFT 2018)
発表年月日
日付 2018-09-19
日付タイプ Issued
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 19:35:34.190501
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3