ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. 学会発表・講演等
  2. ポスター発表

Demonstration of Synchronous Control of EC TL Switch and Gyrotron for ITER EC System

https://repo.qst.go.jp/records/72261
https://repo.qst.go.jp/records/72261
daea4fcf-1d8e-4f37-b75f-22bea8ef90fe
Item type 会議発表用資料 / Presentation(1)
公開日 2017-03-31
タイトル
タイトル Demonstration of Synchronous Control of EC TL Switch and Gyrotron for ITER EC System
言語
言語 jpn
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_c94f
資源タイプ conference object
アクセス権
アクセス権 metadata only access
アクセス権URI http://purl.org/coar/access_right/c_14cb
著者 小田, 靖久

× 小田, 靖久

WEKO 711662

小田, 靖久

Search repository
大島, 克己

× 大島, 克己

WEKO 711663

大島, 克己

Search repository
林, 一生

× 林, 一生

WEKO 711664

林, 一生

Search repository
池田, 亮介

× 池田, 亮介

WEKO 711665

池田, 亮介

Search repository
高橋, 幸司

× 高橋, 幸司

WEKO 711666

高橋, 幸司

Search repository
坂本, 慶司

× 坂本, 慶司

WEKO 711667

坂本, 慶司

Search repository
Gandini, Franco

× Gandini, Franco

WEKO 711668

Gandini, Franco

Search repository
Purohit, Dharmesh

× Purohit, Dharmesh

WEKO 711669

Purohit, Dharmesh

Search repository
米川, 出

× 米川, 出

WEKO 711670

米川, 出

Search repository
大森, 俊道

× 大森, 俊道

WEKO 711671

大森, 俊道

Search repository
Darbos, Caroline

× Darbos, Caroline

WEKO 711672

Darbos, Caroline

Search repository
Henderson, Mark

× Henderson, Mark

WEKO 711673

Henderson, Mark

Search repository
小田 靖久

× 小田 靖久

WEKO 711674

en 小田 靖久

Search repository
池田 亮介

× 池田 亮介

WEKO 711675

en 池田 亮介

Search repository
高橋 幸司

× 高橋 幸司

WEKO 711676

en 高橋 幸司

Search repository
坂本 慶司

× 坂本 慶司

WEKO 711677

en 坂本 慶司

Search repository
抄録
内容記述タイプ Abstract
内容記述 ITER EC system includes equatorial port launcher and upper port launchers as RF power injection device. To select the operating launcher, the waveguide switch in transmission line (TL) is used and its operation is required even during plasma operation also, namely mid-pulse switch operation. To change the waveguide switch the gyrotron has to stop RF power during the switch operation since the direction is changed by mechanical movement of mirror position which takes a few seconds. Since ITER EC system is based on multi-subsystem concept, each subsystem has its own subsystem control unit (SCU) and EC main controller supervises all subsystem controllers. Hence cooperative operation requires to share the information of both RF power status and switch status between gyrotron SCU and TL SCU via main controller. The design of inter-subsystem control scheme is key issue for ITER EC system control and its evaluation is required. In QST, gyrotron and ITER relevant TL test stand were utilized for demonstration of mid-pulse switch operation. For this purpose, SCUs for each subsystem and main controller were developed using ITER relevant control system. The operation of mechanical switch during gyrotron pulse was demonstrated. During the 150 sec operation of high power gyrotron at 400 kW level, waveguide switch in TL was operated to change the direction of RF power. The time duration for switch operation with inter subsystem control scheme took 1.5 sec in total. The synchronizing of RF power suspend and resume with switch motion has been realized and RF power direction control during the gyrotron operation was successfully demonstrated.
会議概要(会議名, 開催地, 会期, 主催者等)
内容記述タイプ Other
内容記述 29th Symposium on Fusion Technology (SOFT2016)
発表年月日
日付 2016-09-06
日付タイプ Issued
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 19:41:55.141942
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3