WEKO3
アイテム
Progress Report on LIPAC
https://repo.qst.go.jp/records/67098
https://repo.qst.go.jp/records/67098e91b4c29-7c39-4f2c-8c44-71b12223cb8f
Item type | 会議発表用資料 / Presentation(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2019-01-18 | |||||
タイトル | ||||||
タイトル | Progress Report on LIPAC | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_c94f | |||||
資源タイプ | conference object | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
杉本, 昌義
× 杉本, 昌義× Akagi, Tomoya× Ebisawa, Takashi× Hirata, Yosuke× Ichimiya, Ryo× Kasugai, Atsushi× Kondo, Keitaro× Maebara, Sunao× Sakamoto, Keishi× Shinya, Takahiro× Abbon, Philippe× Bazin, Nicolas× Bolzon, Benoit× Chauvin, Nicolas× Chel, Stephane× Gobin, Raphael× Jacques Marroncle× Renard, Bertrand× Antoniazzi, Loris× Bellan, Luca× Bortolato, Damiano× Comunian, Michele× Fagotti, Enrico× Grespan, Francesco× Montis, Maulizio× Palmieri, Antonio× Pisent, Andrea× Scantamburlo, Francesco× Pierre-Yves Beauvais× Dzitko, Herve× Gex, Dominique× Heidinger, Roland× Jokinen, Antti× Moya, Ivan× Phillips, Guy× Cara, Philippe× David, Jiménez-Rey× Kirpitchev, Igor× Joaquin, Mollá× Purificacion Méndez× Podadera, Ivan× Regidor, David× Varela, Rodrigo× Weber, Moises× Knaster, Juan× Pruneri, Giuseppe× Sugimoto, Masayoshi× Akagi, Tomoya× Ebisawa, Takashi× Hirata, Yosuke× Ichimiya, Ryo× Kasugai, Atsushi× Kondo, Keitaro× Maebara, Sunao× Sakamoto, Keishi× Shinya, Takahiro× Bolzon, Benoit× Scantamburlo, Francesco× Jokinen, Antti× Cara, Philippe× Knaster, Juan× Pruneri, Giuseppe |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | International Fusion Materials Irradiation Facility (IFMIF) is the neutron source for simulating fusion reactor environment using two 40 MeV/125 mA CW D+ beams. LIPAc facility is under construction in Rokkasho for validating 9 MeV/125 mA CW linac technology as a prototype of the IFMIF accelerator. Commissioning of 5 MeV CW RFQ is underway after the completion of installation of RFQ, MEBT, diagnostic plate. low power beam dump, RF power system and their auxiliaries. As the first step, high power RF conditioning is planned to complete in early 2018 and beam commissioning will start with stepwise approach at the same time. The status of LIPAc construction for preparing 9 MeV acceleration and results of RFQ beam commissioning are presented. | |||||
会議概要(会議名, 開催地, 会期, 主催者等) | ||||||
内容記述タイプ | Other | |||||
内容記述 | 29th Linear Accelerator Conference-LINAC18 | |||||
発表年月日 | ||||||
日付 | 2018-09-18 | |||||
日付タイプ | Issued |