WEKO3
アイテム
SDDR analysis in equatorial port interspace with WCCB TBM-set
https://repo.qst.go.jp/records/66757
https://repo.qst.go.jp/records/667579bc77861-2469-4901-90ba-5554e4657ea1
Item type | 会議発表用資料 / Presentation(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2018-03-30 | |||||
タイトル | ||||||
タイトル | SDDR analysis in equatorial port interspace with WCCB TBM-set | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_c94f | |||||
資源タイプ | conference object | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
権, 暁星
× 権, 暁星× 谷川, 尚× 廣瀬, 貴規× 河村, 繕範× 飯田, 浩正× 権 暁星× 谷川 尚× 廣瀬 貴規× 河村 繕範 |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | Target of SDDR in the port interspace is below 100 μSv/hr to permit personnel access for maintenance. The SDDR in the port interspace with WCCB TBM set was evaluated with MCNP5_D1S, and it was over 100 μSv/hr at 10^6 sec after shutdown. Counter measure of too high SDDR was proposed in present study. The SDDR could be decreased below 100 μSv/hr by using shims and B4C tiles. | |||||
会議概要(会議名, 開催地, 会期, 主催者等) | ||||||
内容記述タイプ | Other | |||||
内容記述 | 12th ITER Neutronics Meeting | |||||
発表年月日 | ||||||
日付 | 2017-10-12 | |||||
日付タイプ | Issued |