WEKO3
アイテム
NIRS scanning system, present status and future prospects
https://repo.qst.go.jp/records/64443
https://repo.qst.go.jp/records/644431acc7159-0a2d-466f-907f-57ed215cdd8b
Item type | 会議発表用資料 / Presentation(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2011-12-02 | |||||
タイトル | ||||||
タイトル | NIRS scanning system, present status and future prospects | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_c94f | |||||
資源タイプ | conference object | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
Furukawa, Takuji
× Furukawa, Takuji× 古川 卓司 |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | A new treatment facility as an extension of the existing HIMAC facility, is constructed for the further development of carbon-ion therapy in NIRS. This new treatment facility is equipped with a 3D irradiation system with pencil beam scanning. The challenge of this project is to realize treatment of a moving target by scanning irradiation. Thus, to realize this, the development of the fast scanning system is one of the most important issues in this project. After the installation of the scanning system, the commissioning of NIRS fast scanning system was started in September 2010. After intense commissioning and quality assurance tests, the treatment with scanned ion beam was started in May 2011. This paper describes the present status and future prospects of the NIRS scanning system | |||||
会議概要(会議名, 開催地, 会期, 主催者等) | ||||||
内容記述タイプ | Other | |||||
内容記述 | 2nd NIRS-ETOILE Joint Symposium on Carbon Ion Therapy | |||||
発表年月日 | ||||||
日付 | 2011-11-27 | |||||
日付タイプ | Issued |