WEKO3
アイテム
Development of ultra-high voltage insulation technology for the power supply components in neutral beam system on ITER
https://repo.qst.go.jp/records/54747
https://repo.qst.go.jp/records/5474738212b5d-d76b-41c1-ab82-0e16778f410c
Item type | 会議発表論文 / Conference Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2017-03-30 | |||||
タイトル | ||||||
タイトル | Development of ultra-high voltage insulation technology for the power supply components in neutral beam system on ITER | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_5794 | |||||
資源タイプ | conference paper | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
梅田, 尚孝
× 梅田, 尚孝× 柏木, 美恵子× 戸張, 博之× 小島, 有志× 大楽, 正幸× 花田, 磨砂也× 前島, 哲也× 渡邊, 和弘× 山中, 晴彦× 梅田 尚孝× 柏木 美恵子× 戸張 博之× 小島 有志× 大楽 正幸× 花田 磨砂也× 前島 哲也× 渡邊 和弘× 山中 晴彦 |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | Dc ultra-high voltage insulation technologies in oil, gas and vacuum have been developed. Based on these technologies, fabrication of dc 1 MV power supply components for the neutral beam (NB) system on ITER has progressed. For DC generators which insulate dc 1 MV for long pulse duration up to 3600 s, oil immersed pressboard with multi-layer structure has been improved to suppress flashover. For 1 MV transmission lines, the R&D results of gas insulations have been applied to realize the compact transmission line containing several high voltage feeders. For a HV bushing which has five stage gaps in vacuum, voltage holding capability in the multistage gaps has been found to be characterized by a total cathode area. Based on these insulation technologies, manufacturing of these components have been completed. As for DC generator and transmission line, voltage holding of 1.2 MV was successfully demonstrated. As for the HV bushing, 240 kV voltage holding for each stage has achieved. These results fulfil the ITER requirements. After that, the installation work of these components has been started in the NB test facility since December 2015. | |||||
書誌情報 |
Proceeding 26th IAEA FEC 発行日 2017-03 |