WEKO3
アイテム
Status of the JT-60SA project: An overview on fabrication, assembly and future exploitation
https://repo.qst.go.jp/records/48869
https://repo.qst.go.jp/records/48869f029beec-21f3-4ae0-a1a6-ee9770f2fd6c
Item type | 学術雑誌論文 / Journal Article(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2018-05-08 | |||||
タイトル | ||||||
タイトル | Status of the JT-60SA project: An overview on fabrication, assembly and future exploitation | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | journal article | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
Tomarchio, V.
× Tomarchio, V.× Barabaschi, P.× Di, Pietro E.× Hanada, Masaya× Kamada, Yutaka× Sakasai, Akira× Shirai, Hiroshi× JT-60SA, Team The× 花田 磨砂也× 鎌田 裕× 逆井 章× 白井 浩 |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | JT-60SA is a superconducting tokamak developed under the Satellite Tokamak Programme of the BroaderApproach Agreement between EU and Japan, and the Japanese national programme. It is designed tooperate in the break-even conditions for long pulse duration (typically 100 s), with a maximum plasmacurrent of 5.5 MA. Its scientific aim is to contribute at early realization of fusion energy, in support tothe ITER project and also to future DEMO devices by addressing key engineering and physical issues foradvanced plasma operation.The JT-60SA Project has shown steady progress in the last years: from the design of the main compo-nents, started in 2007 in a close collaboration between EU and Japan, continuing through the assembly inthe torus hall, started in January 2013 with the delivery of the first large European component, the Cryo-stat Base. Since then big milestones have been achieved, like the complete winding and pre-installationof the three lower Equilibrium Field (EF) coils, the welding of a 340◦of the Vacuum Vessel sectors, andthe completion of most of the Toroidal Field (TF) Coils.Outside the tokamak hall, large auxiliary plant like the Cryogenic System (CS) and the Quench ProtectionCircuits (QPC) have been fully installed and commissioned, while the Switching Network Units (SNU) andTF and EF coils Power Supplies (SCMPS) are completing installation on site. Other components such asCryostat Vessel, Thermal Shields, In Vessel Components and so forth are being manufactured and beingdelivered to Naka site for installation and commissioning.This paper gives technical progress on fabrication, installation and assembly of tokamak componentsand ancillary systems, as well as progress of JT-60SA Research Plan being developed jointly by EU andJapanese fusion communities. | |||||
書誌情報 |
Fusion Engineering and Design 巻 123, p. 3-10, 発行日 2018-05 |
|||||
出版者 | ||||||
出版者 | Elsevier Journals | |||||
DOI | ||||||
識別子タイプ | DOI | |||||
関連識別子 | 10.1016/j.fusengdes.2017.05.041 |