Overview of the IFMIF/EVEDA project
https://repo.qst.go.jp/records/48852
https://repo.qst.go.jp/records/488520acf3837-734a-4453-a5dd-bd7239f31fd8
Item type | 学術雑誌論文 / Journal Article(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2018-05-08 | |||||
タイトル | ||||||
タイトル | Overview of the IFMIF/EVEDA project | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | journal article | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
J.Knaster
× J.Knaster× P.Garin× H.Matsumoto× Y.Okumura× M.Sugimoto× F.Arbeiter× P.Cara× S.Chel× A.Facco× P.Favuzza× T.Furukawa× R.Heidinger× A.Ibarra× T.Kanemura× A.Kasugai× H.Kondo× V.Massaut× J.Molla× G.Micciche× S.O'hira× K.Sakamoto× T.Yokomine× E.Wakai× Integrated, Project Team IFMIF/EVEDA× 奥村 義和× 杉本 昌義× 春日井 敦× 近藤 浩夫× 大平 茂× 坂本 慶司 |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | IFMIF, the International Fusion Materials Irradiation Facility, is presently in its engineering validation and engineering design activities (EVEDA) phase under the Broader Approach Agreement. The engineering design activity (EDA) phase was successfully accomplished within the allocated time. The engineering validation activity (EVA) phase has focused on validating the Accelerator Facility (AF), the Target Facility and the Test Facility (TF) by constructing prototypes. The ELTL at JAEAc, Oarai successfully demonstrated the long-term stability of a Li flow under the IFMIF’s nominal operational conditions keeping the specified free-surface fluctuations below ±1 mm in a continuous manner for 25 d. A full-scale prototype of the high flux test module (HFTM) was successfully tested in the HELOKA loop (KIT, Karlsruhe), where it was demonstrated that the irradiation temperature can be set individually and kept uniform. LIPAc, designed and constructed in European labs under the coordination of F4E, presently under installation and commissioning in the Rokkasho Fusion Institute, aims at validating the concept of IFMIF accelerators with a D+ beam of 125 mA continuous wave (CW) and 9 MeV. The commissioning phases of the H+/D+ beams at 100 keV are progressing and should be concluded in 2017; in turn, the commissioning of the 5 MeV beam is due to start during 2017. The D+ beam through the superconducting cavities is expected to be achieved within the Broader Approach Agreement time frame with the superconducting cryomodule being assembled in Rokkasho. | |||||
書誌情報 |
Nuclear Fusion 巻 57, p. 102016, 発行日 2017-07 |
|||||
出版者 | ||||||
出版者 | IOP Publishing | |||||
DOI | ||||||
識別子タイプ | DOI | |||||
関連識別子 | 10.1088/1741-4326/aa6a6a | |||||
関連サイト | ||||||
識別子タイプ | DOI | |||||
関連識別子 | https://doi.org/10.1088/1741-4326/aa6a6a. | |||||
関連名称 | https://doi.org/10.1088/1741-4326/aa6a6a. |