| アイテムタイプ |
会議発表用資料 / Presentation(1) |
| 公開日 |
2023-03-06 |
| タイトル |
|
|
タイトル |
Recent experience on LIPAc reliability |
|
言語 |
en |
| 言語 |
|
|
言語 |
eng |
| 資源タイプ |
|
|
資源タイプ識別子 |
http://purl.org/coar/resource_type/c_c94f |
|
資源タイプ |
conference presentation |
| 著者 |
Francesco Scantamburlo
Fabio Cismondi
Masuda Kai
Sugimoto Masayoshi
Hasegawa Kazuo
Kasugai Atsushi
Kondo Keitaro
Akagi Tomoya
Kumagai Kohki
Andrea De Franco
Ebisawa Takashi
Hirosawa Koki
Hyun Jibong
Itagaki Tomonobu
Carin Yann
Gex Dominique
Philippe Cara
Herve Dzitko
Ivan Moya martinez
L. Gonzales
C. Caballero
|
| 抄録 |
|
|
内容記述 |
Construction, commissioning and validation of the Linear IFMIF Prototype Accelerator (LIPAc) are carried out in the framework of the IFMIF/EVEDA project. The LIPAc in its current configuration operates with D+ and consists of a 100 keV injector, a 5 MeV RFQ accelerator, a medium and high energy beam transport lines and a beam dump. In its final configuration it will include a HWR-SRF linac and will target to commission a D+ beam in CW of 125 mA CW at 9 MeV. A temporary transport line is currently replacing the SRF linac. In 2019 the beam commissioning campaigns achieved to accelerate a 125 mA D+ beam through the RFQ at low duty cycle of ~0.1 %. The latest beam commissioning campaign was carried out for a few weeks in July 2021. In 2021 and 2022 extensive experimental campaigns have been carried out on the injector and RFQ targeting CW operation. The injector campaign aims at identifying the best configuration for operating at CW and nominal beam current. The RFQ operation aims at reaching RFQ conditioning at CW at nominal voltage of 132kV. This paper will focus on the reliability of injector and RFPS-RFQ during the respective conditioning campaigns and recent efforts made to improve future LIPAc reliability. |
| 会議概要(会議名, 開催地, 会期, 主催者等) |
|
|
内容記述 |
Accelerator Reliability Workshop 2022 |
| 発表年月日 |
|
|
日付 |
2022-10-17 |