Beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc) toward high-duty operation at 5 MeV, 125 mA D+
https://repo.qst.go.jp/records/2004796
https://repo.qst.go.jp/records/20047968dec21ca-08de-481c-bb0f-6122112aa115
| アイテムタイプ | 会議発表論文 / Conference Paper(1) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 公開日 | 2024-02-26 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| タイトル | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| タイトル | Beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc) toward high-duty operation at 5 MeV, 125 mA D+ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 言語 | en | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 言語 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 言語 | eng | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 資源タイプ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 資源タイプ識別子 | http://purl.org/coar/resource_type/c_5794 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 資源タイプ | conference paper | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| アクセス権 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| アクセス権 | metadata only access | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 著者 |
Masuda Kai
× Masuda Kai
× Akagi Tomoya
× Andrea De Franco
× Hirosawa Koki
× Hyun Jibong
× Kumagai Kohki
× Saerom Kwon
× Takahide Nakayama
× Sugimoto Masayoshi
× F. BENEDETTI
× Carin Yann
× Gex Dominique
× Ivan Moya martinez
× Francesco Scantamburlo
× N. BAZIN
× B. BOLZON
× T. CHAMINADE
× N. CHAUVIN
× S. CHEL
× J. MARRONCLE
× B. RENARD
× F. ARRANZ
× B. BRAÑAS
× J. CASTELLANOS
× C. DE LA MORENA
× D. GAVELA
× D. JIMENEZ-REY
× P. MÉNDEZ
× J. MOLLA
× O. NOMEN
× C. OLIVER
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 抄録 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 内容記述タイプ | Abstract | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 内容記述 | Construction and validation of the Linear IFMIF Prototype Accelerator (LIPAc) have been and are being conducted in Rokkasho, Aomori, Japan, under the EU-JA collaborative framework of the IFMIF/EVEDA project. A stepwise strategy applies to the installation and beam commissioning of the LIPAc. The current phase of beam commissioning aims at high duty cycle operations with the nominal beam current of 125 mA D+ at a reduced beam energy of 5 MeV before the planned installation of a Superconducting RF Linac to boost the beam energy up to 9 MeV. As the first step, commissioning with reduced beam currents of 10 m A H+ and 20 mA D+ was conducted. The beams were characterized and comparisons were made with simulations for verification. The nominal beam current of 125 mA D+ is then being targeted. So far, a beam of 112 mA D+ has been produced and transported successfully without significant beam loss. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 書誌情報 |
Proceedings of 29th IAEA Fusion Energy Conference 発行日 2024-02 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||