LIPAc Beam Commissioning Approach for the First Beam through SRF Linac
https://repo.qst.go.jp/records/2003153
https://repo.qst.go.jp/records/200315383254204-0be6-4693-bc39-3be587bc7b23
| アイテムタイプ | 会議発表用資料 / Presentation(1) | |||||||
|---|---|---|---|---|---|---|---|---|
| 公開日 | 2026-04-02 | |||||||
| タイトル | ||||||||
| タイトル | LIPAc Beam Commissioning Approach for the First Beam through SRF Linac | |||||||
| 言語 | en | |||||||
| 言語 | ||||||||
| 言語 | eng | |||||||
| 資源タイプ | ||||||||
| 資源タイプ識別子 | http://purl.org/coar/resource_type/c_c94f | |||||||
| 資源タイプ | conference presentation | |||||||
| 著者 |
Masuda Kai
× Masuda Kai
|
|||||||
| 抄録 | ||||||||
| 内容記述 | The Engineering Validation and Engineering Design Activities for the International Fusion Materials Irradiation Facility (IFMIF/EVEDA) are being pursued under the Broader Approach agreement between EURATOM and the Japanese government. Since the IFMIF requires an accelerator with unprecedented performances to provide D+ beams of 40 MeV, 125 mA (x2 lines) in CW, the feasibility is being tested with the Linear IFMIF Prototype Accelerator (LIPAc), which is under commissioning in Rokkasho, Japan within the EU-JA collaborative framework. The LIPAc consists of a 100 keV injector and the world longest 5 MeV RFQ accelerator, followed by re-buncher cavities and an HWR-SRF linac, ending in a Beam Dump designed to stop the world highest deuteron current of 125 mA CW at 9 MeV. This paper will present some highlights from the beam commissioning already performed, and plan for the next beam commissioning campaign, which is the first one after installation of the SRF linac. | |||||||
| 会議概要(会議名, 開催地, 会期, 主催者等) | ||||||||
| 内容記述 | 12th Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-12) | |||||||
| 発表年月日 | ||||||||
| 日付 | 2026-03-24 | |||||||