Progress of assembly and installation of LIPAc SRF Cryomodule under the EU–JA Collaborative Framework

https://repo.qst.go.jp/records/2002423
https://repo.qst.go.jp/records/2002423
1fc1c3ec-9179-4900-b651-8b5b81244f1f
アイテムタイプ 会議発表用資料 / Presentation(1)
公開日 2025-10-01
タイトル
タイトル Progress of assembly and installation of LIPAc SRF Cryomodule under the EU–JA Collaborative Framework
言語 en
言語
言語 eng
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_c94f
資源タイプ conference presentation
著者 Ebisawa Takashi

× Ebisawa Takashi

Ebisawa Takashi

Search repository
Kondo Keitaro

× Kondo Keitaro

Kondo Keitaro

Search repository
Masuda Kai

× Masuda Kai

Masuda Kai

Search repository
Kasugai Atsushi

× Kasugai Atsushi

Kasugai Atsushi

Search repository
Hasegawa Kazuo

× Hasegawa Kazuo

Hasegawa Kazuo

Search repository
Nicolas Bazin

× Nicolas Bazin

Nicolas Bazin

Search repository
Janic Chambrillon

× Janic Chambrillon

Janic Chambrillon

Search repository
Adam Jean-Pierre

× Adam Jean-Pierre

Adam Jean-Pierre

Search repository
Dominique Gex

× Dominique Gex

Dominique Gex

Search repository
Herve Dzitko

× Herve Dzitko

Herve Dzitko

Search repository
Yann Carin

× Yann Carin

Yann Carin

Search repository
阪井寛志

× 阪井寛志

阪井寛志

Search repository
加古永治

× 加古永治

加古永治

Search repository
抄録
内容記述 The commissioning of LIPAc (Linear IFMIF Prototype Accelerator) is ongoing at QST Rokkasho Institute for Fusion Energy within the engineering validation of the accelerator system up to 9 MeV/125 mA in continuous wave under international collaboration between Japan and Europe. Several SRF cryomodules will be required for IFMIF to accelerate deuterons from 5 MeV to 40 MeV. The prototype of the first of these cryomodules has been manufactured and will be installed and tested on the LIPAc. It holds the eight Half Wave Resonator and RF couplers to accelerate the beam and the eight superconducting solenoids to focus it.During the cryomodule assembly, several non-conformities were identified, including vacuum leaks and cryogenic pipe issues. These challenges were addressed through a coordinated effort involving Japanese and European partners. Solutions included the refabrication and repair in Japan of critical components, adhering to Japan’s High Pressure Gas Safety Act and international standards. Material selection, thermal cycling treatments, magnetization assessments, and regulated welding with non-destructive tests (pressure and penetration) were jointly implemented. This poster outlines the technical approaches taken, highlights the collective efforts of the LIPAc team in resolving the encountered issues, and reports on the progress toward the successful assembly and validation of the LIPAc SRF cryomodule.
会議概要(会議名, 開催地, 会期, 主催者等)
内容記述 22nd International conference on RF superconductivity
発表年月日
日付 2025-09-26
戻る
0
views
See details
Views

Versions

Ver.1 2026-01-19 00:58:05.597773
Show All versions

Share

Share
tweet

Cite as

Other

print

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX
  • ZIP

コミュニティ

確認

確認

確認


Powered by WEKO3


Powered by WEKO3