Commissioning status of the RF power source for the LIPAc SRF LINAC |
|
言語 |
en |
| 言語 |
|
|
言語 |
eng |
| 資源タイプ |
|
|
資源タイプ識別子 |
http://purl.org/coar/resource_type/c_5794 |
|
資源タイプ |
conference paper |
| アクセス権 |
|
|
アクセス権 |
metadata only access |
|
アクセス権URI |
http://purl.org/coar/access_right/c_14cb |
| 著者 |
Hirosawa Koki
Naoya Kubo
Francesco Scantamburlo
Ivan Moya martinez
Jean-Pierre Adam
Luis Gonzalez-Gallego
Oliver Piquet
|
| 抄録 |
|
|
内容記述タイプ |
Abstract |
|
内容記述 |
The Linear IFMIF Prototype Accelerator (LIPAc) is designed as a high-current deuteron linear accelerator (linac) capable of accelerating a 125 mA beam up to 9 MeV in continuous wave (CW) mode. The RFQ linac and subsequent beam transport lines equipped with several diagnostics successfully commissioned a 119 mA deuteron beam with an 8.75 % duty cycle. The superconducting RF (SRF) linac is the remaining critical component to be commissioned in CW to reach the final acceleration target of 9 MeV. The installation of the SRF linac into the beamline is currently underway. In preparation for the integrated commissioning of the SRF linac, the RF station has been commissioned in stand-alone mode. Unlike the synchronized RF control of the RFQ (where 8 RF chains inject in one resonant cavity), the SRF-RF control can be fine-tuned individually and new functionalities specific to the SRF environment, such as quench detection, have been implemented. This report summarizes the features of the LIPAc SRF-RF system and its current commissioning status. |
| 書誌情報 |
Proceedings of the 22nd International Conference on RF Superconductivity