High beam current operation with beam diagnostics at LIPAc
https://repo.qst.go.jp/records/2001186
https://repo.qst.go.jp/records/200118652ba9a15-c246-43e1-9420-6510c7cb1989
| アイテムタイプ | 学術雑誌論文 / Journal Article(1) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 公開日 | 2024-05-21 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| タイトル | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| タイトル | High beam current operation with beam diagnostics at LIPAc | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 言語 | en | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 言語 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 言語 | eng | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 資源タイプ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 資源タイプ | journal article | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 著者 |
Saerom Kwon
× Saerom Kwon
× P. Abbon
× Akagi Tomoya
× F. Benedetti
× B. Bolzon
× Y. Carin
× T. Chaminade
× N. Chauvin
× F. Cismondi
× Andrea De Franco
× A. Gaget
× J. M. Garcia
× D. Gex
× Hirosawa Koki
× D. Jimenez Ray
× Kondo Keitaro
× L. Maindive
× J. Marroncle
× Masuda Kai
× J. C. Morales Vega
× Ota Masayuki
× I. Podadera
× M. Poggi
× A. Rodriguez
× A. Ros
× IFMIF/EVEDA Integrated Project Team
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 抄録 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 内容記述タイプ | Abstract | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 内容記述 | The Linear International Fusion Materials Irradiation Facility Prototype Accelerator (LIPAc) is under commissioning in Rokkasho Fusion Institute in Japan and aims to accelerate 125 mA D+ at 9 MeV in Continuous Wave mode for validating the IFMIF accelerator design. To ensure a fine characterization and tuning of the machine many beam diagnostics are installed spanning from injector to the beam dump. The beam operations in 1.0 ms pulsed D+ at 5 MeV were successfully completed with a low power beam dump in 2019. Despite the challenges posed by the pandemic, the crucial transition to a new LINAC configuration was also finalized to enable operation in 1.0 ms ? CW D+ at 5 MeV with the high-power beam dump. The 1st beam operation of the configuration was carried out in 2021. The experiences and challenges encountered during these beam campaigns are described in this paper. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 書誌情報 |
Journal of Instrumentation (JINST) 巻 19, p. T05013, 発行日 2024-05 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 出版者 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 出版者 | IOP Publishing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| DOI | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 識別子タイプ | DOI | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 関連識別子 | 10.1088/1748-0221/19/05/T05013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||