Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

https://repo.qst.go.jp/records/2000575
https://repo.qst.go.jp/records/2000575
894fb105-0b80-4506-bc8f-7f7a6942cb9a
Item type 学術雑誌論文 / Journal Article(1)
公開日 2024-07-25
タイトル
タイトル Lessons learned after three years of SPIDER operation and the first MITICA integrated tests
言語 en
言語
言語 eng
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_6501
資源タイプ journal article
著者 Diego Marcuzzi

× Diego Marcuzzi

Diego Marcuzzi

Search repository
Vanni Toigo

× Vanni Toigo

Vanni Toigo

Search repository
Marco Boldrin

× Marco Boldrin

Marco Boldrin

Search repository
Giuseppe Chitarin

× Giuseppe Chitarin

Giuseppe Chitarin

Search repository
Samuele Dal Bello

× Samuele Dal Bello

Samuele Dal Bello

Search repository
Luca Grando

× Luca Grando

Luca Grando

Search repository
Adriano Luchetta

× Adriano Luchetta

Adriano Luchetta

Search repository
Roberto Pasqualotto

× Roberto Pasqualotto

Roberto Pasqualotto

Search repository
Mauro Pavei

× Mauro Pavei

Mauro Pavei

Search repository
Gianluigi Serianni

× Gianluigi Serianni

Gianluigi Serianni

Search repository
Loris Zanotto

× Loris Zanotto

Loris Zanotto

Search repository
Riccardo Agnello

× Riccardo Agnello

Riccardo Agnello

Search repository
Piero Agostinetti

× Piero Agostinetti

Piero Agostinetti

Search repository
Matteo Agostini

× Matteo Agostini

Matteo Agostini

Search repository
Daniele Aprile

× Daniele Aprile

Daniele Aprile

Search repository
Marco Barbisan

× Marco Barbisan

Marco Barbisan

Search repository
Manuela Battistella

× Manuela Battistella

Manuela Battistella

Search repository
Giovanni Berton

× Giovanni Berton

Giovanni Berton

Search repository
Marco Bigi

× Marco Bigi

Marco Bigi

Search repository
Matteo Brombin

× Matteo Brombin

Matteo Brombin

Search repository
Valentina Candela

× Valentina Candela

Valentina Candela

Search repository
Valeria Candeloro

× Valeria Candeloro

Valeria Candeloro

Search repository
Alessandra Canton

× Alessandra Canton

Alessandra Canton

Search repository
Riccardo Casagrande

× Riccardo Casagrande

Riccardo Casagrande

Search repository
Caterina Cavallini

× Caterina Cavallini

Caterina Cavallini

Search repository
Roberto Cavazzana

× Roberto Cavazzana

Roberto Cavazzana

Search repository
Luigi Cordaro

× Luigi Cordaro

Luigi Cordaro

Search repository
Nuno Cruz

× Nuno Cruz

Nuno Cruz

Search repository
Mauro Dalla Palma

× Mauro Dalla Palma

Mauro Dalla Palma

Search repository
Mattia Dan

× Mattia Dan

Mattia Dan

Search repository
Antonio De Lorenzi

× Antonio De Lorenzi

Antonio De Lorenzi

Search repository
抄録
内容記述タイプ Abstract
内容記述 ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system, to reach the desired performances during its various phases of operation. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities.

In order to enable such development, a Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, called SPIDER and MITICA. SPIDER is dedicated developing and characterizing large efficient negative ion sources at relevant parameters in ITER-like conditions: source and accelerator located in the same vacuum where the beam propagates, immunity to electromagnetic interferences of multiple radio-frequency (RF) antennas, avoidance of RF-induced discharges on the outside of the source. Three years of experiments on SPIDER have addressed to the necessary design modifications to enable full performances. The source is presently under a long shut-down phase to incorporate learnings from the experimental campaign, in particular events/issues occurred during operation, which led to the identification of improvement opportunities/necessities (e.g. RF discharges, local burns, water leaks, other damages, configuration/design upgrades to maximize chances/margin to quest target parameters).

Parallelly, developments on MITICA, the full-scale prototype of the ITER Neutral Beam Injector (NBI) featuring a 1 MV accelerator and ion neutralization, are underway including manufacturing of the beam source, accelerator and the beam line components, while power supplies and auxiliary plants, already installed, are under final testing and commissioning.

Integration, commissioning and tests of the 1 MV power supplies are essential for this first-of-kind system, unparalleled both in research and industry field. 1.2 MV dc insulating tests of high voltage components were successfully completed. The integrated test to confirm 1 MV output by combining invertor systems, DC generators and transmission lines extracted errors/accidents in some components. To realize a concrete system for ITER, said events have been addressed and solutions for the repair and the improvement of the system were developed.

Hence, NBTF is emerging as a necessary facility, due to the large gap with existing injectors, effectively dedicated to identify issues and find solutions to enable successful ITER NBI operations in a time bound fashion. The lessons learned during the implementation on NBTF and future perspectives are here discussed.
書誌情報 Fusion Engineering and Design

巻 191, p. 113590, 発行日 2023-06
出版者
出版者 Elsevier
ISSN
収録物識別子タイプ ISSN
収録物識別子 1873-7196
DOI
識別子タイプ DOI
関連識別子 10.1016/j.fusengdes.2023.113590
戻る
0
views
See details
Views

Versions

Ver.1 2025-08-15 02:24:12.287719
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3