ログイン
Language:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. 原著論文

A strategy to identify breakdown location in MITICA test facility: results of high voltage test campaign

https://repo.qst.go.jp/records/2000571
https://repo.qst.go.jp/records/2000571
453c6fbd-f659-4e00-b4e8-357b54685c30
アイテムタイプ 学術雑誌論文 / Journal Article(1)
公開日 2024-07-25
タイトル
タイトル A strategy to identify breakdown location in MITICA test facility: results of high voltage test campaign
言語 en
言語
言語 eng
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_6501
資源タイプ journal article
著者 Loris Zanotto

× Loris Zanotto

Loris Zanotto

Search repository
Marco Boldrin

× Marco Boldrin

Marco Boldrin

Search repository
Giuseppe Chitarin

× Giuseppe Chitarin

Giuseppe Chitarin

Search repository
Mattia Dan

× Mattia Dan

Mattia Dan

Search repository
Tommaso Patton

× Tommaso Patton

Tommaso Patton

Search repository
Francesco Santoro

× Francesco Santoro

Francesco Santoro

Search repository
Vanni Toigo

× Vanni Toigo

Vanni Toigo

Search repository
Tobari Hiroyuki

× Tobari Hiroyuki

Tobari Hiroyuki

Search repository
Kojima Atsushi

× Kojima Atsushi

Kojima Atsushi

Search repository
抄録
内容記述タイプ Abstract
内容記述 The Acceleration Grid Power Supply of the MITICA test facility in Padova (Italy) is currently under commissioning. The power conversion system, the DC generator, and the High Voltage equipment have been individually commissioned, whereas the integration tests are ongoing. It is a challenging process due to the unconventional application, to the variety of different electrical technologies involved and to the complexity of the interfaces.
During the integrated tests of the power supplies the achievement of 700 kV stable operation has been demonstrated for the first time in a Neutral Beam Injector, but an unexpected event occurred, most likely a
breakdown in the HV part, which resulted in a fault of the DC generator. A subsequent test using an auxiliary power supply was performed to check the voltage withstanding capability of the HV plant, but another break-down occurred at around 1MV.
This paper describes the activity performed to identify the location of the breakdowns affecting the integrated tests. A test campaign has been devised with increased diagnostic capabilities and specific strategy conceived to trigger intentional breakdowns in specific locations and collect measurement patterns for different cases. The results of the campaign will be presented and the current understanding of the issue will be described, with a view on future tests and further improvements of diagnostics.
書誌情報 Fusion Engineering and Design

巻 187, p. 113381, 発行日 2023-02
出版者
出版者 Elsevier
ISSN
収録物識別子タイプ ISSN
収録物識別子 1873-7196
DOI
識別子タイプ DOI
関連識別子 10.1016/j.fusengdes.2022.113381
戻る
0
views
See details
Views

Versions

Ver.1 2025-08-15 02:24:04.479557
Show All versions

Share

Share
tweet

Cite as

Other

print

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX
  • ZIP

コミュニティ

確認

確認

確認


Powered by WEKO3


Powered by WEKO3