@misc{oai:repo.qst.go.jp:00078369, author = {Shimosaki, Yoshito and Kasugai, Atsushi and Kondo, Keitaro and Sakamoto, Keishi and Sugimoto, Masayoshi and Cara, Philippe and Duglue, Daniel and Dzitko, Herve and Heidinger, Roland and Chauvin, Nicolas and Bellan, Luca and Comunian, Michele and Fagotti, Enrico and Pisent, Andrea and Branas, Beatriz and Oliver, Concepcion and Podadera, Ivan and Kobayashi, Hitoshi and Takayama, Ken and Shimosaki, Yoshito and Kasugai, Atsushi and Kondo, Keitaro and Sakamoto, Keishi and Sugimoto, Masayoshi}, month = {May}, note = {The installation and commissioning of the Linear IFMIF Prototype Accelerator (LIPAc), which is under installation and commissioning under the Broader Approach agreement, are ongoing. The deuteron beam will be accelerated by the RFQ linac from 100 keV to 5 MeV during the commissioning phase-B and by the SRF linac up to 9 MeV during the phase-C. The commissioning phase-B+ will be implemented between phase-B and C to complete the engineering validation of the RFQ linac before installing the SRF linac. The lattice for the deuteron beam of 5 MeV and 125 mA at the commissioning phase-B+ was designed., 10th International Particle Accelerator Conference, IPAC2019}, title = {Lattice design for 5MeV-125mA CW RFQ operation in the LIPAc}, year = {2019} }