{"created":"2023-05-15T14:57:44.563925+00:00","id":78368,"links":{},"metadata":{"_buckets":{"deposit":"ca7df129-2415-43be-a803-c6db7707da82"},"_deposit":{"created_by":1,"id":"78368","owners":[1],"pid":{"revision_id":0,"type":"depid","value":"78368"},"status":"published"},"_oai":{"id":"oai:repo.qst.go.jp:00078368","sets":["10:28"]},"author_link":["822118","822119"],"item_10005_date_7":{"attribute_name":"発表年月日","attribute_value_mlt":[{"subitem_date_issued_datetime":"2019-05-20","subitem_date_issued_type":"Issued"}]},"item_10005_description_5":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"The 1st proton beam acceleration of the Linear IFMIF Prototype Accelerator (LIPAc) through its novel RFQ was succeeded on 13th June 2018. Addition to plenty of beam diagnostics equipped in the beam line, we prepared some radiation detectors placed around the accelerator in order to acquire supplemental information of the beam, as an indirect measurement. In the first day of the beam injection to the RFQ, the gamma-rays corresponding to certain excited states of Al of the low power beam dump were successfully detected by a LaBr3(Ce) scintillation detector. Some neutrons, which would originate from the interaction of protons with Cu somewhere, were also observed. These results proved that the beam was certain-ly accelerated up to about 2.5 MeV, and provided us a definitive confidence that the RFQ was working appro-priately from the very beginning of the commissioning. Also, the comparison of the radiation yields with the RFQ transmission provided additional information on the beam energy distribution.","subitem_description_type":"Abstract"}]},"item_10005_description_6":{"attribute_name":"会議概要(会議名, 開催地, 会期, 主催者等)","attribute_value_mlt":[{"subitem_description":"10th International Particle Accelerator Conference (IPAC2019) ","subitem_description_type":"Other"}]},"item_access_right":{"attribute_name":"アクセス権","attribute_value_mlt":[{"subitem_access_right":"metadata only access","subitem_access_right_uri":"http://purl.org/coar/access_right/c_14cb"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"Kondo, Keitaro"}],"nameIdentifiers":[{"nameIdentifier":"822118","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"Kondo, Keitaro","creatorNameLang":"en"}],"nameIdentifiers":[{"nameIdentifier":"822119","nameIdentifierScheme":"WEKO"}]}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"eng"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"conference object","resourceuri":"http://purl.org/coar/resource_type/c_c94f"}]},"item_title":"Radiation Measurement in the 1st Beam Commissioning Campaign of the LIPAc RFQ","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"Radiation Measurement in the 1st Beam Commissioning Campaign of the LIPAc RFQ"}]},"item_type_id":"10005","owner":"1","path":["28"],"pubdate":{"attribute_name":"公開日","attribute_value":"2020-01-08"},"publish_date":"2020-01-08","publish_status":"0","recid":"78368","relation_version_is_last":true,"title":["Radiation Measurement in the 1st Beam Commissioning Campaign of the LIPAc RFQ"],"weko_creator_id":"1","weko_shared_id":-1},"updated":"2023-05-15T23:16:55.409884+00:00"}