@inproceedings{oai:repo.qst.go.jp:00054973, author = {池田, 亮介 and 小田, 靖久 and 梶原, 健 and 小林, 貴之 and 中井, 拓 and 寺門, 正之 and 高橋, 幸司 and 森山, 伸一 and 坂本, 慶司 and 池田 亮介 and 小田 靖久 and 梶原 健 and 小林 貴之 and 中井 拓 and 寺門 正之 and 高橋 幸司 and 森山 伸一 and 坂本 慶司}, book = {Proceedings of IRMMW-THz 2018}, month = {Oct}, note = {High-power operations of Japan ITER-gyrotron are underway in the QST. Two ITER-gyrotrons was manufactured and these short-pulse tests were completed. Similar beam profiles at the output window and MOU outlet were identified. The output power of 1 MW in 1 ms was achieved for both gyrotrons. Conditioning of one of the gyrotrons has being carried out and the operation of 1.0 MW-100 s was achieved. In addition, full-power modulation of 5 kHz for 10 s was demonstrated.}, title = {Progress on 1 MW Operation of Japan Gyrotron for ITER EC System}, year = {2018} }