| アイテムタイプ |
会議発表用資料 / Presentation(1) |
| 公開日 |
2025-12-25 |
| タイトル |
|
|
タイトル |
Commissioning status of the RF power source for the LIPAc SRF LINAC |
|
言語 |
en |
| 言語 |
|
|
言語 |
eng |
| 資源タイプ |
|
|
資源タイプ識別子 |
http://purl.org/coar/resource_type/c_6670 |
|
資源タイプ |
conference poster |
| 著者 |
Hirosawa Koki
Naoya Kubo
Francesco Scantamburlo
Ivan Moya martinez
Jean-Pierre Adam
Luis Gonzalez-Gallego
Oliver Piquet
|
| 抄録 |
|
|
内容記述 |
The Linear IFMIF Prototype Accelerator (LIPAc) is designed as a high-current deuteron linear accelerator (linac) capable of accelerating a 125 mA beam up to 9 MeV in continuous wave (CW) mode. The RFQ linac and subsequent beam transport lines equipped with several diagnostics successfully commissioned a 119 mA deuteron beam with an 8.75 % duty cycle. The superconducting RF (SRF) linac is the remaining critical component to be commissioned in CW to reach the final acceleration target of 9 MeV. The installation of the SRF linac into the beamline is currently underway. In preparation for the integrated commissioning of the SRF linac, the RF station has been commissioned in stand-alone mode. Unlike the synchronized RF control of the RFQ (where 8 RF chains inject in one resonant cavity), the SRF-RF control can be fine-tuned individually and new functionalities specific to the SRF environment, such as quench detection, have been implemented. This report summarizes the features of the LIPAc SRF-RF system and its current commissioning status. |
| 会議概要(会議名, 開催地, 会期, 主催者等) |
|
|
内容記述 |
22nd international conference on RF superconductivity |
| 発表年月日 |
|
|
日付 |
2025-09-23 |