| タイトル |
|
|
タイトル |
Progress of High-Duty Deuteron Beam Commissioning in LIPAc: Progress and Next Steps |
|
言語 |
en |
| 言語 |
|
|
言語 |
eng |
| 資源タイプ |
|
|
資源タイプ識別子 |
http://purl.org/coar/resource_type/c_c94f |
|
資源タイプ |
conference presentation |
| 著者 |
Akagi Tomoya
Andrea De Franco
Ebisawa Takashi
Hasegawa Kazuo
Hirosawa Koki
Hyun Jibong
Itagaki Tomonobu
Kaneko Naomi
Kasugai Atsushi
Kondo Keitaro
Kumagai Kohki
Saerom Kwon
Masuda Kai
Mizuno Akihiko
Sugimoto Masayoshi
|
| 抄録 |
|
|
内容記述 |
The Engineering Validation and Engineering Design Activities for the International Fusion Materials Irradiation Facility (IFMIF/EVEDA) are being conducted under the Broader Approach agreement between EURATOM and the Japanese government. The Linear IFMIF Prototype Accelerator (LIPAc) aims at validating the design of the low-energy section of the 40-MeV/125-mA IFMIF deuteron accelerator, thus up to 9 MeV in continuous-wave (CW) operation. While the Superconducting RF Linac (SRF Linac) has been assembled, the LIPAc beamline was operating in the intermediate configuration, namely the Phase B+ commissioning. The main objectives of this phase were to validate the 5-Mev/125-mA deuteron beam acceleration by the RFQ at a high-duty cycle and to characterize the beam properties in preparation for the final configuration with the SRF Linac. In June 2024, the Phase B+ commissioning was completed with the acceleration and transport of a 5 MeV/119 mA deuteron beam at 8.75% duty cycle up to the beam dump. This presentation will detail the outcomes of Phase B+. |
| 会議概要(会議名, 開催地, 会期, 主催者等) |
|
|
内容記述 |
71st ICFA Advanced Beam Dynamics workshop on High-Intensity and High-Brightness Hadron Beams (HB2025) |
| 発表年月日 |
|
|
日付 |
2025-10-23 |