OVERVIEW OF ACHEVEMENTS AND OUTLOOK OF THE IFMIF/EVEDA PROJECT
https://repo.qst.go.jp/records/2001698
https://repo.qst.go.jp/records/2001698e308056a-ddac-4818-ad2c-17b56324552c
| 名前 / ファイル | ライセンス | アクション |
|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
| アイテムタイプ | 会議発表用資料 / Presentation(1) | |||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 公開日 | 2025-09-22 | |||||||||||||||||||||||||||||||||||||||
| タイトル | ||||||||||||||||||||||||||||||||||||||||
| タイトル | OVERVIEW OF ACHEVEMENTS AND OUTLOOK OF THE IFMIF/EVEDA PROJECT | |||||||||||||||||||||||||||||||||||||||
| 言語 | en | |||||||||||||||||||||||||||||||||||||||
| 言語 | ||||||||||||||||||||||||||||||||||||||||
| 言語 | eng | |||||||||||||||||||||||||||||||||||||||
| 資源タイプ | ||||||||||||||||||||||||||||||||||||||||
| 資源タイプ識別子 | http://purl.org/coar/resource_type/c_6670 | |||||||||||||||||||||||||||||||||||||||
| 資源タイプ | conference poster | |||||||||||||||||||||||||||||||||||||||
| 著者 |
Hasegawa Kazuo
× Hasegawa Kazuo
× Kasugai Atsushi
× Kondo Keitaro
× Masuda Kai
× Sato Satoshi
× Ochiai Kentaro
× Y. Carin
× H. Dzitko
× F. Cismondi
× D. Gex
× S. Chel
× A. Pisent
× D. Jimenez
× J. Molla
× G. Micciche
× D. Radloff
× D. Terentyev
|
|||||||||||||||||||||||||||||||||||||||
| 抄録 | ||||||||||||||||||||||||||||||||||||||||
| 内容記述 | The Engineering Validation and Engineering Design Activities for the International Fusion Materials Irradiation Facility (IFMIF/EVEDA) project is underway as one of the three projects (IFMIF/EVEDA, IFERC and JT60SA) of the Broader Approach (BA) agreement between EURATOM and the Japanese government since 2007. The IFMIF is to provide accelerator-based D-Li neutrons at appropriate energy and sufficient intensity to test samples for candidate materials in fusion energy reactors such as DEMO. The mission of the IFMIF/EVEDA project is to produce detailed engineering design of the IFMIF and to validate on major components: Accelerator Facility, Lithium Target Facility and Test Facility. In the first phase of the BA which ended by March 2020, the Engineering Validation Activity (EVA) of the Lithium Target Facility and Test Facility was completed by constructing prototypes, while the EVA of Accelerator Facility with the Linear IFMIF Prototype Accelerator (LIPAc) is still on-going. In the new phase (II), the activities are focused on the continuing the commissioning of the LIPAc and enhancement of some sub-systems for fusion neutron source design (FNSD). This article overviews the achievements and outlook of the LIPAc commissioning and FNSD activities. | |||||||||||||||||||||||||||||||||||||||
| 会議概要(会議名, 開催地, 会期, 主催者等) | ||||||||||||||||||||||||||||||||||||||||
| 内容記述 | IAEA FEC2025 IFMIF/EVEDA ワークショップ | |||||||||||||||||||||||||||||||||||||||
| 発表年月日 | ||||||||||||||||||||||||||||||||||||||||
| 日付 | 2025-09-17 | |||||||||||||||||||||||||||||||||||||||