WEKO3
アイテム
{"_buckets": {"deposit": "a831d3d0-c9a5-4941-8176-189baeb2d60f"}, "_deposit": {"created_by": 1, "id": "82728", "owners": [1], "pid": {"revision_id": 0, "type": "depid", "value": "82728"}, "status": "published"}, "_oai": {"id": "oai:repo.qst.go.jp:00082728", "sets": ["1"]}, "author_link": ["1013591", "1013594", "1013595", "1013590", "1013593", "1013592"], "item_8_biblio_info_7": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "2021-03", "bibliographicIssueDateType": "Issued"}, "bibliographicPageStart": "112048", "bibliographicVolumeNumber": "164", "bibliographic_titles": [{"bibliographic_title": "Fusion Engineering and Design "}]}]}, "item_8_description_5": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "This article presents development of remote handling tool for FW central bolt tightening and its demonstration of the functional requirements in prototype testing. A compliance mechanism was newly designed and successfully demonstrated for the capacity to handle the misalignment of the thread part and to withstand 10 kN m torque. Maraging steel wrench with out-of-standard Torx bit was designed and fabricated. Irradiation test of the mar aging steel material, in which corrosion was found at the total dose 0.3MGy, is also reported. ", "subitem_description_type": "Abstract"}]}, "item_8_publisher_8": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "Elsevier"}]}, "item_8_relation_14": {"attribute_name": "DOI", "attribute_value_mlt": [{"subitem_relation_type_id": {"subitem_relation_type_id_text": "10.1016/j.fusengdes.2020.112048", "subitem_relation_type_select": "DOI"}}]}, "item_8_relation_17": {"attribute_name": "関連サイト", "attribute_value_mlt": [{"subitem_relation_type_id": {"subitem_relation_type_id_text": "https://doi.org/10.1016/j.fusengdes.2020.112048", "subitem_relation_type_select": "DOI"}}]}, "item_8_source_id_9": {"attribute_name": "ISSN", "attribute_value_mlt": [{"subitem_source_identifier": "0920-3796", "subitem_source_identifier_type": "ISSN"}]}, "item_access_right": {"attribute_name": "アクセス権", "attribute_value_mlt": [{"subitem_access_right": "metadata only access", "subitem_access_right_uri": "http://purl.org/coar/access_right/c_14cb"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Yuto, Noguchi"}], "nameIdentifiers": [{"nameIdentifier": "1013590", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Nakata, Kentaro"}], "nameIdentifiers": [{"nameIdentifier": "1013591", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Nobukazu, Takeda"}], "nameIdentifiers": [{"nameIdentifier": "1013592", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Yuto, Noguchi", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "1013593", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Kentaro , Nakata", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "1013594", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Nobukazu, Takeda", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "1013595", "nameIdentifierScheme": "WEKO"}]}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "journal article", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Development of bolting tool for remote handling of ITER first wall central bolt", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "Development of bolting tool for remote handling of ITER first wall central bolt"}]}, "item_type_id": "8", "owner": "1", "path": ["1"], "permalink_uri": "https://repo.qst.go.jp/records/82728", "pubdate": {"attribute_name": "公開日", "attribute_value": "2021-04-14"}, "publish_date": "2021-04-14", "publish_status": "0", "recid": "82728", "relation": {}, "relation_version_is_last": true, "title": ["Development of bolting tool for remote handling of ITER first wall central bolt"], "weko_shared_id": -1}
Development of bolting tool for remote handling of ITER first wall central bolt
https://repo.qst.go.jp/records/82728
https://repo.qst.go.jp/records/82728f2f73250-79d8-451d-a416-34c8a3e12ef2
Item type | 学術雑誌論文 / Journal Article(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2021-04-14 | |||||
タイトル | ||||||
タイトル | Development of bolting tool for remote handling of ITER first wall central bolt | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | journal article | |||||
アクセス権 | ||||||
アクセス権 | metadata only access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_14cb | |||||
著者 |
Yuto, Noguchi
× Yuto, Noguchi× Nakata, Kentaro× Nobukazu, Takeda× Yuto, Noguchi× Kentaro , Nakata× Nobukazu, Takeda |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | This article presents development of remote handling tool for FW central bolt tightening and its demonstration of the functional requirements in prototype testing. A compliance mechanism was newly designed and successfully demonstrated for the capacity to handle the misalignment of the thread part and to withstand 10 kN m torque. Maraging steel wrench with out-of-standard Torx bit was designed and fabricated. Irradiation test of the mar aging steel material, in which corrosion was found at the total dose 0.3MGy, is also reported. | |||||
書誌情報 |
Fusion Engineering and Design 巻 164, p. 112048, 発行日 2021-03 |
|||||
出版者 | ||||||
出版者 | Elsevier | |||||
ISSN | ||||||
収録物識別子タイプ | ISSN | |||||
収録物識別子 | 0920-3796 | |||||
DOI | ||||||
識別子タイプ | DOI | |||||
関連識別子 | 10.1016/j.fusengdes.2020.112048 | |||||
関連サイト | ||||||
識別子タイプ | DOI | |||||
関連識別子 | https://doi.org/10.1016/j.fusengdes.2020.112048 |