ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. 学会発表・講演等
  2. 口頭発表

Development of ITER gyrotron and its preliminary test result

https://repo.qst.go.jp/records/66754
https://repo.qst.go.jp/records/66754
9988c5eb-f5ed-4105-a6df-14ad37ad7ff7
Item type 会議発表用資料 / Presentation(1)
公開日 2018-03-29
タイトル
タイトル Development of ITER gyrotron and its preliminary test result
言語
言語 eng
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_c94f
資源タイプ conference object
アクセス権
アクセス権 metadata only access
アクセス権URI http://purl.org/coar/access_right/c_14cb
著者 小田, 靖久

× 小田, 靖久

WEKO 656389

小田, 靖久

Search repository
池田, 亮介

× 池田, 亮介

WEKO 656390

池田, 亮介

Search repository
梶原, 健

× 梶原, 健

WEKO 656391

梶原, 健

Search repository
高橋, 幸司

× 高橋, 幸司

WEKO 656392

高橋, 幸司

Search repository
小林, 貴之

× 小林, 貴之

WEKO 656393

小林, 貴之

Search repository
坂本, 慶司

× 坂本, 慶司

WEKO 656394

坂本, 慶司

Search repository
森山, 伸一

× 森山, 伸一

WEKO 656395

森山, 伸一

Search repository
小田 靖久

× 小田 靖久

WEKO 656396

en 小田 靖久

Search repository
池田 亮介

× 池田 亮介

WEKO 656397

en 池田 亮介

Search repository
梶原 健

× 梶原 健

WEKO 656398

en 梶原 健

Search repository
高橋 幸司

× 高橋 幸司

WEKO 656399

en 高橋 幸司

Search repository
小林 貴之

× 小林 貴之

WEKO 656400

en 小林 貴之

Search repository
坂本 慶司

× 坂本 慶司

WEKO 656401

en 坂本 慶司

Search repository
森山 伸一

× 森山 伸一

WEKO 656402

en 森山 伸一

Search repository
抄録
内容記述タイプ Abstract
内容記述 An electron cyclotron heating and current drive system in ITER is designed to inject RF power of 20 MW to control actively plasmas. The RF power is supplied by 24 gyrotrons. QST procures to supply 8 gyrotrons which produce 170 GHz / 1 MW each and 1 equatorial launcher for ITER.
The short pulse test of the first ITER gyrotron has started since 2017 April after preparation of test stand. A new anode and body power supply system which has the same configuration with ITER high voltage power supply (HVPS) system was installed into the gyrotron test stand. The new power supply system consists of DC HVPS devices which generate high voltage and HV switch components which control HV injection into gyrotrons. The ITER gyrotron was installed into the test stand with ITER SCM. The conditioning for long pulse operation follows after short pulse test. As preliminary results of long pulse operation, the operation of 1 MW output power up to 10 s has been succeeded. Its operation parameter was compliant to the specification of HVPS in ITER. The operation of 300 s pulse under 200 kW was also demonstrated. The temperature of cooling channel water (CCW) and in-tube vacuum of the gyrotron reached the steady state and no significant heating of internal components of gyrotron were detected. The success of steady state operation indicates that the cooling performance was sufficient for 1 MW long pulse operation.
会議概要(会議名, 開催地, 会期, 主催者等)
内容記述タイプ Other
内容記述 日韓加熱電流駆動ワークショップ
発表年月日
日付 2018-02-27
日付タイプ Issued
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 20:45:19.606528
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3