量研学術機関リポジトリ「QST-Repository」は、国立研究開発法人 量子科学技術研究開発機構に所属する職員等が生み出した学術成果(学会誌発表論文、学会発表、研究開発報告書、特許等)を集積しインターネット上で広く公開するサービスです。 Welcome to QST-Repository where we accumulates and discloses the academic research results(Journal Publications, Conference presentation, Research and Development Report, Patent, etc.) of the members of National Institutes for Quantum and Radiological Science and Technology.
Thank you very much for using our website. On the 11th of March 2019, this site was moved from our own network server to the JAIRO Cloud network server. If you previously bookmarked this site, that bookmark will no longer work. We would be grateful if you could bookmark the website again. Thank you very much for your understanding and cooperation.
The heating neutral beam (HNB) systems at ITER are designed to inject a total of 33 MW of either 1 MeV D0 or 870 keV H0 beams into the ITER plasma using two injectors with a possible addition of a third injector later to increase the injected power to ~50 MW. The injectors become radioactive due to the neutron flux from ITER and, in order to avoid the resulting complex remote maintenance, the design, choice of materials and the manufacturing process of each component of the injector is, wherever possible, such that they survive the life time of ITER. To ensure a smooth operational phase of neutral beams at ITER a neutral beam test facility (NBTF) is under construction at Consorzio RFX, Padova, (hereinafter referred to as RFX), which consists of 2 test beds, the 100 kV “SPIDER”, and a 1 MV “MITICA” facilities, which will be used to optimize the source operation for H and D beams. MITICA is essentially a full scale ITER prototype injector for the ITER beam parameters. The manufacturing and operation of the facility will allow validation of the operational space of the injectors and provide valuable information about the manufacturing processes applicable to HNB components. Operation of the two facilities is expected to begin in 2016 and 2019 respectively. Currently experiments on the ELISE facility with a half ITER sized RF beam source are underway. ITER relevant parameters for the H beams have almost been achieved. Efforts are underway to optimise the same with D beams. The experimental database from ELISE will be an important input for establishing the ITER relevant parameter space on the SPIDER source. This paper discusses the present status of the design and development of the injectors for ITER and the progress on the test facilities.